Hits:Updated:2023-10-08 17:10:57【Print】
According to the relevant regulations of the environmental protection acceptance procedures for the completion of construction projects, the environmental protection acceptance status of the 8000 ton annual wind power generation connection and lifting system manufacturing project of Zhejiang Zhuyu Machinery Technology Co., Ltd. is hereby announced as follows: Project Name: Zhejiang Zhuyu Machinery Technology Co., Ltd. Annual Production of 8000 tons of Wind Power Connection and Lifting System Manufacturing Project Construction unit: Zhejiang Zhuyu Machinery Technology Co., Ltd Construction location: No.3 Ketai Road, Science and Technology Park, Shipu Town, Xiangshan County, Ningbo City Construction Content: In May 2022, the enterprise entrusted Zhejiang Renxin Environmental Science and Technology Institute Co., Ltd. to prepare the "Environmental Impact Report Form for Zhejiang Zhuyu Machinery Technology Co., Ltd.'s Annual Production of 8000 Tons of Wind Power Connection and Lifting System Manufacturing Project". On July 12 of the same year, it obtained approval from the Xiangshan Branch of Ningbo Ecological Environment Bureau (Zhejiang Xiang Huanxu [2022] No. 44). This time, the project will be accepted. Main environmental protection measures: (1) Waste gas Heating and forging smoke and dust are discharged at high altitude after being treated with filter cotton and low-temperature plasma exhaust gas treatment facilities; The shot blasting dust is discharged from high altitude after being dusted with cloth bags. (2) Wastewater Domestic wastewater is pre treated in septic tanks and then discharged into pipes. (3) Noise Adopt low noise equipment, strengthen equipment maintenance and upkeep, and take effective measures such as sound insulation and noise reduction. (4) Solid waste General solid waste: leftover materials, collected dust, and waste packaging materials collected and sold for comprehensive utilization; Hazardous waste: Waste mineral oil and saponified liquid are entrusted to Ningbo Dadi Chemical Environmental Protection Co., Ltd. for disposal. Publicity period: October 8, 2023 to November 2, 2023 (20 working days) Public feedback method: The public can log in http://ahxyhjgc.com/index.php Check the project acceptance report (see attachment below). If the public has any opinions or suggestions on the construction project, they can report them to the construction unit within the public notice period. If you have any questions, please leave your contact information (name, address, phone number or email) for timely response and feedback.
Zhejiang Zhuyu Machinery Technology Co., Ltd
October 8, 2023 |